Installing work accurately is an obvious, but challenging, step in any digital project execution. This presentation will review practical workflows in the design model, trade/fabrication modeling, and layout/execution process including:
Model Accuracy: Don’t coordinate with 5mm of tolerance if you can’t layout & install with that same tolerance
Establishing Proper A Coordinate Space in the modeling environment
Challenges from Unique Units (US Survey Feet vs. International Feet)
IFC Auditing to ensure compliance with US Survey Feet based layout
How to establish and maintain a jobsite survey control network
The role of different layout & QC tools: Robotic Total Stations, Survey GPS, LIDAR, and Dimensioned Coordination/Working Drawings with a trusty tape measure.
Methods of “round tripping” data into a model environment